10:00
Plugged in, waiting for the sun
Back from the school run, you plug in. While the panels barely cover the house, the car waits; once there's surplus, it starts gently and rises with the sun.
Systems · EV charging
You plug in and the house decides: spare sun if there is some, off-peak if not, flat out only when you're in a hurry. While it charges, the oven and air conditioning keep working and nothing trips.
Your selection: 0 systems. See it on the house →
Any given day
10:00
Back from the school run, you plug in. While the panels barely cover the house, the car waits; once there's surplus, it starts gently and rises with the sun.
13:45
A cloud passes and you switch on the oven. The charger lowers its power or pauses, and resumes when the house allows. Nothing trips.
19:00
You tap “Fast” in the app or on the garage switch: it charges with all the power available, even from the grid. When done, it returns to the usual mode by itself.
22:30
You open the garage from your phone or remote and its light comes on. You plug in: after a cloudy day, the car waits until midnight and charges off-peak.
How it works
The charger has its own circuit. The Miniserver tells it at every moment how much power it may use, based on the sun, the tariff and the rest of the house.
What it senses
What it controls
Without internet. Without internet the car keeps charging on sun, off-peak or fast, and the house keeps guarding its limit: the Miniserver decides. You lose tomorrow's prices for indexed tariffs, notifications and remote mode changes.
In numbers
56 h
of off-peak in a row every weekend under 2.0TD: from Saturday 00:00 to Monday 08:00. The time for a car that can wait.
Source: blog.cnmc.es
€0.73/kW
a year is the cost of night-rate power (P2), regulated part for 2026, versus €27.70 for daytime. To charge at night you can raise just that one; above the highest your home has had, the distributor charges a one-off fee per kW.
Source: blog.cnmc.es
7.4 kW
is what a 32 A single-phase charger draws at full power: more than a 5.75 kW contracted power. So it must know when to give way.
Source: loxone.com
Better together
Installation
In a new build I plan in the charger circuit and the data cable to the garage, even if the car arrives in two years.
In an existing house, the main job is the circuit from the panel to the garage. An authorised electrician runs and certifies it under ITC-BT-52; I connect the charger to the Miniserver and program it.
The Air version of the charger talks to the Miniserver by radio: it only needs its power circuit. If you already have another charger, I first check whether it accepts commands.
No small print
Questions
Tell me the car model, whether you have solar panels and where you park. I'll tell you which charger fits and what circuit is needed from the panel.
Systems
Each system has its own page. They all share sensors and rules on the same Miniserver.